Paper describes single screw turbine machinery of 26,500 shp using steam at 750 psi and 950 F; installation, which includes 6.5 Mw of electrical power generation, is arranged for complete remote control, main and auxiliary machinery being designed to run for protracted periods unattended; manual adjustment at sea is reduced to setting Bridge Revolution Telegraph Transmitter; diagrams showing layout and components, and photographs of first installation are included. (discussion) (v 82 Dec 1965 p 59-141)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Machinery for fleet replenishment tankers


    Additional title:

    North East Coast Instn Engrs Shipbldrs -- Trans


    Contributors:


    Publication date :

    1966


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :



    Machinery for tankers

    Barringer, H. | Engineering Index Backfile | 1929


    GAS TANKERS - LPG fleet listing

    Online Contents | 2002