Passenger cableway between San Sebastian and Miramar over harbor of Barcelona, 4335 ft long, with overhead clearance of 204 ft for passage of shipping; central steel frame tower on mole is 360 ft high; cars carry 20 passengers at speed of 13 ft per sec; ropeway is of Bleichert-Zuegg design.
Aerial ropeway across harbour of Barcelona
Civ Eng (Lond)
Civil Engineering (London) ; 26 , n 312
1932
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|The Tilmanstone aerial ropeway
Engineering Index Backfile | 1930
The Tilmanstone aerial ropeway
Engineering Index Backfile | 1930