Progressive reductions in maintenance costs have occurred during introduction of bonus and inspection systems on Third Ave Railway; outline of accounting system employed.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Third avenue railway obtains lower maintenance costs as result of bonus and inspection system


    Additional title:

    Transit J


    Published in:

    Publication date :

    1932


    Size :

    4 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Third Avenue railway truck-overhauling shop

    Johnson, A.R. | Engineering Index Backfile | 1914



    Overhead line maintenance trucks of the third avenue system

    Kent, James D. | Engineering Index Backfile | 1916


    Opening of the third avenue railway, N. Y.

    Engineering Index Backfile | 1900