Progressive reductions in maintenance costs have occurred during introduction of bonus and inspection systems on Third Ave Railway; outline of accounting system employed.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Third avenue railway obtains lower maintenance costs as result of bonus and inspection system


    Weitere Titelangaben:

    Transit J


    Erschienen in:

    Erscheinungsdatum :

    1932


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Third Avenue railway truck-overhauling shop

    Johnson, A.R. | Engineering Index Backfile | 1914



    Opening of the third avenue railway, N. Y.

    Engineering Index Backfile | 1900


    Overhead line maintenance trucks of the third avenue system

    Kent, James D. | Engineering Index Backfile | 1916