Bridge at focal point of traffic had to be designed for heavy traffic flow and full 4-lane width, with sufficient waterway also provided; structure consisted of reinforced concrete rigid frame of 34 ft clear span, hinged at base; Am Assn State Highway Officials specifications provide design data.
Modern rigid-frame bridge built by seabees on Guam
Civ Eng (NY)
Civil Engineering (New York) ; 15 , n 11
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Automotive engineering | 1988
|Sewage outfall line floated into place by seabees
Engineering Index Backfile | 1945
|A Methodology to Improve Products Used by Seabees
NTIS | 1971
|Development of a Quick Camp System for Seabees
NTIS | 1973
|Development of a Quick Camp System for Seabees
NTIS | 1973
|