In assignment in Central Pacific, heavy 16-in. ball-joint, cast iron pipe sections were bolted together in 250-ft lengths, rolled onto skidway for connection in line, and "horsed" into position with tractor and crane.
Sewage outfall line floated into place by seabees
Civ Eng (NY)
Civil Engineering (New York) ; 15 , n 6
1945
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Automotive engineering | 1988
|Development of a Quick Camp System for Seabees
NTIS | 1973
|Development of a Quick Camp System for Seabees
NTIS | 1973
|A Methodology to Improve Products Used by Seabees
NTIS | 1971
|AIAA | 1965
|