Brief description of building of combined tram road and board road to give access to drilling site; drilling site area of swamp was filled in to depth of 4 1/2 ft, for which approximately 4000 cu yd of sawdust were hauled; fill of 2 1/2 ft was made for turnarounds and board road from tram; derrick was supported by 48 by 48-ft timber mat laid directly on top sawdust.
Preparing swamp locations in coastal Louisiana
Oil Gas J
Oil and Gas Journal ; 44 , n 5
1945
Article (Journal)
English