Brief description of building of combined tram road and board road to give access to drilling site; drilling site area of swamp was filled in to depth of 4 1/2 ft, for which approximately 4000 cu yd of sawdust were hauled; fill of 2 1/2 ft was made for turnarounds and board road from tram; derrick was supported by 48 by 48-ft timber mat laid directly on top sawdust.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Preparing swamp locations in coastal Louisiana


    Weitere Titelangaben:

    Oil Gas J


    Beteiligte:
    Williams, N. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1945


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    SWAMP BOAT

    QASIMOV QALIB DAVUD | Europäisches Patentamt | 2018

    Freier Zugriff

    FEATURES LOCATIONS HELICOPTER IN COASTAL AREAS

    Artur Artemenko / Oleh Strutsinskiy / Olena Lukashuk et al. | DOAJ | 2019

    Freier Zugriff

    Setting swamp anchors

    Greer, C.L. | Engineering Index Backfile | 1929


    Stability of swamp

    McElroy, Samuel | Engineering Index Backfile | 1888