Description of centralized traffic control installed on 116-mi single track subdivision between Portola, Calif, and Oroville; track circuits on sidings with signaling to expedite moves into and out of sidings; coded track circuits also control indicators on track cars to warn of approaching trains. (see also Ry Age v 118 n 25 June 23 1945 p 1108-11)
Western Pacific installs C.T.C. on 116-mile subdivision through Feather River Canyon
Ry Signaling
Railway Signaling ; 38 , n 6
1945
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Western Pacific installs C.T.C. on 116-mile subdivision through Feather River Canyon
Engineering Index Backfile | 1945
Southern Pacific installs C.T.C.
Engineering Index Backfile | 1947
Engineering Index Backfile | 1943
Engineering Index Backfile | 1943
Missouri pacific installs C.T.C. on 34 miles
Engineering Index Backfile | 1937