Description of centralized traffic control installed on 116-mi single track subdivision between Portola, Calif, and Oroville; track circuits on sidings with signaling to expedite moves into and out of sidings; coded track circuits also control indicators on track cars to warn of approaching trains. (see also Ry Age v 118 n 25 June 23 1945 p 1108-11)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Western Pacific installs C.T.C. on 116-mile subdivision through Feather River Canyon


    Weitere Titelangaben:

    Ry Signaling


    Erschienen in:

    Erscheinungsdatum :

    1945


    Format / Umfang :

    10 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch





    Southern Pacific installs C.T.C.

    Engineering Index Backfile | 1947


    Virginian installs C.T.C.

    Engineering Index Backfile | 1943


    Virginian installs C.T.C.

    Engineering Index Backfile | 1943


    Missouri pacific installs C.T.C. on 34 miles

    Engineering Index Backfile | 1937