Description of centralized traffic control installed on 116-mi single track subdivision between Portola, Calif, and Oroville; track circuits on sidings with signaling to expedite moves into and out of sidings; coded track circuits also control indicators on track cars to warn of approaching trains. (See also Ry Signaling v 38 n 6 June 1945 p 374-83)
Western Pacific installs C.T.C. on 116-mile subdivision through Feather River Canyon
Ry Age
Railway Age ; 118 , n 25
1945
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Western Pacific installs C.T.C. on 116-mile subdivision through Feather River Canyon
Engineering Index Backfile | 1945
Southern Pacific installs C.T.C.
Engineering Index Backfile | 1947
Engineering Index Backfile | 1943
Engineering Index Backfile | 1943
Missouri pacific installs C.T.C. on 34 miles
Engineering Index Backfile | 1937