Discussion of factors governing construction of new 3015-ft Northern Pacific Railway Tunnel; determination of location limited by existence of old tunnel which had to be protected from effects of blasting; excavation of approaches; concrete operations; foundations and curbs; tunnel lining.
Railroad tunnel in Montana
Western Construction News
Western Construction News ; 20 , n 5
1945
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hudson River tunnel railroad terminal
Engineering Index Backfile | 1892
|Tieless railroad track in tunnel of Hamburg's underground railroad
Engineering Index Backfile | 1963
|Driving record-size railroad tunnel
Engineering Index Backfile | 1949
Utah copper company builds railroad tunnel
Engineering Index Backfile | 1945
|