Illustrated description of methods and equipment employed at Naval Construction Yard, for construction of large passenger turbine steamship Orcades for Orient Line; method of construction embodying economical combination of riveting and welding will increase carrying capacity of ship by some 2000 tons, as compared with similar ship of prewar design; particulars of vessel. (See also Engineer v 181 n 4700 Feb 8 1946 p 124-5; Shipbldg and Shipg Rec v 67 n 7 Feb 14 1946 p 184-6)
Shipbuilding at barrow-in-furness
Shipbldr Mar Engine-Bldr
Shipbuilder and Marine Engine-Builder ; 53 , n 444
1946
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shipbuilding at barrow-in-furness
Engineering Index Backfile | 1946
Shipbuilding at barrow-in-furness
Engineering Index Backfile | 1946
The tramways in Barrow-in-furness
Engineering Index Backfile | 1904
Blyth Workcats delivers multipurpose workboat to Barrow-in-Furness
Online Contents | 2010
The new furness shipbuilding yard at Haverton Hill-on-Tees
Engineering Index Backfile | 1920