Illustrated description of methods and equipment employed at Naval Construction Yard, for construction of large passenger turbine steamship Orcades for Orient Line; method of construction embodying economical combination of riveting and welding will increase carrying capacity of ship by some 2000 tons, as compared with similar ship of prewar design; particulars of vessel. (See also Engineer v 181 n 4700 Feb 8 1946 p 124-5; Shipbldg and Shipg Rec v 67 n 7 Feb 14 1946 p 184-6)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Shipbuilding at barrow-in-furness


    Weitere Titelangaben:

    Shipbldr Mar Engine-Bldr


    Erschienen in:

    Erscheinungsdatum :

    1946


    Format / Umfang :

    5 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Shipbuilding at barrow-in-furness

    Engineering Index Backfile | 1946


    Shipbuilding at barrow-in-furness

    Engineering Index Backfile | 1946


    The tramways in Barrow-in-furness

    Engineering Index Backfile | 1904