Illustrated description of methods and equipment employed at Naval Construction Yard, for construction of large passenger turbine steamship Orcades for Orient Line; method of construction embodying economical combination of riveting and welding will increase carrying capacity of ship by some 2000 tons, as compared with similar ship of prewar design; particulars of vessel. (see also Shipbldg and Shipg Rec v 67 n 7 Feb 14 1946 p 184-6; Shipbldr and Mar Engine-Bldr v 53 n 444 Mar 1946 p 109-13)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Shipbuilding at barrow-in-furness


    Weitere Titelangaben:

    Engineer


    Erschienen in:

    Engineer ; 181 , n 4700


    Erscheinungsdatum :

    1946


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Shipbuilding at barrow-in-furness

    Engineering Index Backfile | 1946


    Shipbuilding at barrow-in-furness

    Engineering Index Backfile | 1946


    The tramways in Barrow-in-furness

    Engineering Index Backfile | 1904



    Recent Dynamic Launches at Barrow-in-Furness: Prediction and Reality

    Salisbury, J. / Dobb, J. / Royal Institute of Naval Architects | British Library Conference Proceedings | 2003