Problem of plant with single mutator on small railway system is interesting as mutator must take over either function: power supply or power recuperation, automatically and according to requirements; in this field Brown Boveri has carried out tests in Baden in which d-c machine coupled to synchronous motor takes place of locomotive.
Railway plants in which only one mutator is used for power supply and for recuperation
Brown Boveri Rev
Brown Boveri Review ; 24 , n 7
1937
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Swiss mutator plants then and now
Engineering Index Backfile | 1944
|Advantages of pumpless mutator plants in traction sub-stations
Engineering Index Backfile | 1944
|Multi-option Model of Railway Traffic Organization Including the Energy Recuperation
Springer Verlag | 2016
|Multi-option Model of Railway Traffic Organization Including the Energy Recuperation
British Library Conference Proceedings | 2016
|Engineering Index Backfile | 1940
|