New electrified route of Southern Railway consists of 95 mi of extension from Hampton Court Junction; power obtained from grid substations; company's own generating station at Durnsford Road, Wimbledon, provided with 12,500 kw turbo alternating set; rectification by mercury arc installations converts grid supply to 660 v d-c. (see also Elec Ry Traction (supp to Ry Gaz) June 25 1937 p 1225-48)
London-Portsmouth electrification
Transport World
Transport World ; 82 , n 2613
1937
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
London-Portsmouth electrification
Engineering Index Backfile | 1937
Electrification of southern railway to Portsmouth
Engineering Index Backfile | 1937
Electrification of southern railway to Portsmouth
Engineering Index Backfile | 1937
Southern railway electrification to Portsmouth via Horsham
Engineering Index Backfile | 1938
Southern railway electrification to Portsmouth via Horsham
Engineering Index Backfile | 1938