Five trains, each with four pairs of articulated twin cars and observation car hauled by 4-6-2 type streamlined locomotives between King's Cross and Edinburgh at average speed of 65.6 mph, built at Doncaster Works of London and North Eastern Railroad; each pair of twin articulated cars is 114 ft 9 in. long over buffers with trucks spaced on 47 ft centers; rated tractive force at 85% boiler pressure is 35,000 lb; weight in working order 374,000 lb. (See also - editorial comment p 45; Ry Age v 103 n 4 July 24 1937 p 103-5; Ry Gaz v 67 n 1 July 2 1937 p 30-4; Engineering v 144 n 3730 July 9 1937 p 40-2; Int Ry Congress Assn -- Bul v 19 n 8 Aug 1937 p 1798-1809)
London and north eastern inaugurates "coronation" trains
Engineer
Engineer ; 164 , n 4252
1937
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
London and north eastern inaugurates "coronation" trains
Engineering Index Backfile | 1937
London and north eastern inaugurates "coronation" trains
Engineering Index Backfile | 1937
London and north eastern inaugurates "coronation" trains
Engineering Index Backfile | 1937
Tourist trains on London and North-Eastern Railway
Engineering Index Backfile | 1933
Tourist trains on London and north-eastern railway
Engineering Index Backfile | 1933