Modern methods employed in laying petroleum pipe lines through primeval forests of Sumatra; pipe line consists of seamless steel pipe with electrically welded joints; total of 23,736 pipe sections were laid; 268-km line is buried 70 cm underground; method of construction, protective coatings, etc, described. (See also Petroleum v 33 n 17 Apr 28 1937 p 1-8)
Modern methods employed in laying petroleum pipe lines through primeval forests of Sumatra
Moderne Verlegung einer Rohrleitung durch den Urwald von Sumatra
Foerdertechnik ; 30 , n 16
1937
7 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Modern methods employed in laying petroleum pipe lines through primeval forests of Sumatra
Engineering Index Backfile | 1937
|Jacking methods employed in laying transmission line in Chicago area
Engineering Index Backfile | 1937
|Transportation of petroleum by pipe lines
Engineering Index Backfile | 1929
Transportation of petroleum by pipe lines
Engineering Index Backfile | 1928