Notes on laying of 9.7 mi of 20 in. line from Burnham, Ill, to Gary, Ind; job included crossing 97 railway tracks, 46 paved city streets and Indiana Harbor Ship Canal; at one point, 32-in. casing was jacked 330 ft by pushing it through ground to pass 5 tracks without tunneling; other special construction problems are described.
Jacking methods employed in laying transmission line in Chicago area
Gas
Gas ; 13 , n 5
1937
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Development of long span pipe jacking method for laying underground pipe
Tema Archive | 1988
|Modern methods employed in laying petroleum pipe lines through primeval forests of Sumatra
Engineering Index Backfile | 1937
|