Reinforced concrete highway bridge consisting principally of 6 spans 155 ft to 175 ft in length, over Little Miami River at Fosters Crossing, Ohio, eliminating dangerous railroad crossing and replacing bad section of trunk highway.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    High level bridge corrects bad alignment


    Additional title:

    Eng News-Rec


    Published in:

    Publication date :

    1938


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    High level bridge corrects bad alignment

    Engineering Index Backfile | 1938


    Computer corrects wagon wastage

    Robins, P.J. | Engineering Index Backfile | 1964


    Servo corrects interferometer-mirror tilt

    Schindler, R. A. | NTRS | 1977