Planned arc 202 km from Mannheim to Plockingen; stretch to Heilbronn 113 km opened for traffic in 1935; 40 km to Stuttgart finished but without locks; illustrated description of engineering structures.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Canalization of River Neckar for heavy traffic


    Additional title:

    Der Neckarkanal


    Contributors:

    Published in:

    VDI Zeitschrift ; 82 , n 21


    Publication date :

    1938


    Size :

    5 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    German


    Keywords :


    10 yr of Meuse River canalization

    De Vries, J.W. | Engineering Index Backfile | 1940


    Canalization of Lower Rhine and river Lek

    Schaank, E.M.H. | Engineering Index Backfile | 1956


    Complex canalization of rivers

    Starosolsky, Oe. | Tema Archive | 1973


    Canalization of the upper St. Lawrence

    Adams, William H. | Engineering Index Backfile | 1920


    Intersection two-phase signal control and canalization method

    ZHAO SHENG / LIU MIN / WEN HUIYING | European Patent Office | 2015

    Free access