Planned arc 202 km from Mannheim to Plockingen; stretch to Heilbronn 113 km opened for traffic in 1935; 40 km to Stuttgart finished but without locks; illustrated description of engineering structures.
Canalization of River Neckar for heavy traffic
Der Neckarkanal
VDI Zeitschrift ; 82 , n 21 ; p 630-634
1938
5 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
10 yr of Meuse River canalization
| Engineering Index Backfile | 1940
Canalization of Lower Rhine and river Lek
| Engineering Index Backfile | 1956
Complex canalization of rivers
| Tema Archiv | 1973
Canalization of the upper St. Lawrence
| Engineering Index Backfile | 1920
Intersection two-phase signal control and canalization method
| Europäisches Patentamt | 2015