End of double-track at Waverly, Neb., and Greenwood controlled remotely by agent located 6.8 mi. away; track and signal plan of station layouts.
Burlington saves $6,440 A year by remote-control interlocking
Ry. Signaling
Railway Signaling ; 23 , n 2
1930
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Remote control for interlocking saves $6000 annually
Engineering Index Backfile | 1931
Burlington saves $16,200 a year by consolidating interlockers
Engineering Index Backfile | 1928
Engineering Index Backfile | 1957
Burlington installs extensive new electric interlocking
Engineering Index Backfile | 1932
|Interlocking three miles long on Burlington
Engineering Index Backfile | 1938
|