Fourmile section of multiple-track road on Chesapeake and Ohio from Newport, Ky., to Cincinnati, includes new bridge and extensive track elevation; track and signal plan of territory from Cincinnati, to "NX" Cabin, Newport; chart of aspects and indications of signals; compressor equipment; air line and connections; power and main wire distribution; circuits and batteries; switch layouts. (See also Ry. Signaling vol. 23, no. 4, Apr. 1930 pp. 128-134, 12 figs)
C. and O. installs new interlocking and either-direction signaling
Ry. Age
Railway Age ; 88 , n 8
1930
4 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
C. and O. installs new interlocking and either-direction signaling
Engineering Index Backfile | 1930
|B. And M. Installs either-direction signaling in hoosac tunnel
Engineering Index Backfile | 1929
|B. And M. Installs either-direction signaling in hoosac tunnel
Engineering Index Backfile | 1929
|Erie installs either-direction signaling on seven miles of double track
Engineering Index Backfile | 1932
Erie installs electric interlocking
Engineering Index Backfile | 1939