Automatic block signaling arranged for either-direction operation on each of two tracks has recently been installed between HY tower, Hammond, Ind and Griffith; traffic direction lacking, improvements in inter-lockings and crossing signals at 10 highways included; track and signal plan; automatic block signaling equipment; interlocking changes.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Erie installs either-direction signaling on seven miles of double track


    Additional title:

    Ry Signaling


    Published in:

    Publication date :

    1932


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English