Test installation on 11 mi. of track and with two locomotives equipped proves satisfactory; description of system; plan showing location of signals and track inductors; electrical control of cab signals and automatic brake valve; pneumatic apparatus on locomotive; operation of system. (see also Ry. Elec. Engr., vol. 21, no. 6, June 1930, pp. 178-181, 6 figs)
Wabash tests automatic train control with cablights
Ry. Signaling
Railway Signaling ; 23 , n 5
1930
6 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Wabash tests automatic train control with cablights
Engineering Index Backfile | 1930
Automatic signaling installed on Wabash
Engineering Index Backfile | 1943
Engineering Index Backfile | 1941
Automatic interlocking on Wabash
Engineering Index Backfile | 1935
Automatic interlocker saves Wabash a year
Engineering Index Backfile | 1930