Test installation on 11 mi. of track and with two locomotives equipped proves satisfactory; description of system; plan showing location of signals and track inductors; electrical control of cab signals and automatic brake valve; pneumatic apparatus on locomotive; operation of system. (See also Ry. Signaling vol. 23, no. 5, May 1930 pp. 175-180, 8 figs)
Wabash tests automatic train control with cablights
Ry. Elec. Engr
Railway Electrical Engineer ; 21 , n 6
1930
4 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Wabash tests automatic train control with cablights
Engineering Index Backfile | 1930
Engineering Index Backfile | 1941
Automatic interlocking on Wabash
Engineering Index Backfile | 1935
Automatic signaling installed on Wabash
Engineering Index Backfile | 1943
Automatic interlocker saves Wabash a year
Engineering Index Backfile | 1930