Test installation on 11 mi. of track and with two locomotives equipped proves satisfactory; description of system; plan showing location of signals and track inductors; electrical control of cab signals and automatic brake valve; pneumatic apparatus on locomotive; operation of system. (See also Ry. Signaling vol. 23, no. 5, May 1930 pp. 175-180, 8 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Wabash tests automatic train control with cablights


    Additional title:

    Ry. Elec. Engr


    Published in:

    Publication date :

    1930


    Size :

    4 pages


    Remarks:

    6 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English





    Automatic installed on Wabash

    Engineering Index Backfile | 1941


    Automatic interlocking on Wabash

    Engineering Index Backfile | 1935


    Automatic signaling installed on Wabash

    Engineering Index Backfile | 1943


    Automatic interlocker saves Wabash a year

    Engineering Index Backfile | 1930