New double track of modern design laid between old tracks on Main street by Winnipeg Electric Co. without halting regular service or inconveniencing patrons; old track had been laid at 25 ft. 3 in.; this allowed just enough room to construct new tracks at 12 ft. centers without disturbing old rails.
Laying track without interruption of service
Elec. Traction
Electric Traction ; 26 , n 4
1930
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pointing at Side Track, without Interruption of Main Track
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1951
Engineering Index Backfile | 1951