Old bridge fitted for modern traffic by conversion of three simple 257-ft. land spans into continuous trusses with new pier constructed at center, and by erection of two 300-ft. river spans, all without interfering with railway or highway traffic. (See also - (discussion) p 259-278, 25 figs; Eng. News-Rec., vol. 106, no. 19, May 7, 1931, pp. 764-765, 2 figs)
Reconstruction of attock bridge across the river indus on North Western Railway, India
Instn. Civil Engrs. -- Min. Proc
Institution of Civil Engineers -- Meeting ; 1931 Strengthening
Institution Civil Engineers -- Mining Proceedings ; 230 , n 4767
1931
25 pages
Conference paper
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of attock bridge across the river indus on North Western Railway, India
Engineering Index Backfile | 1931
|Indus bridge at Kalabagh, North Western Railway, India
Engineering Index Backfile | 1934
|Reconstruction of Kotri bridge, North-Western Railway of India
Engineering Index Backfile | 1933
Bridge over the indus river at Kotri, northwestern railway
Engineering Index Backfile | 1901
North western railway of India
Engineering Index Backfile | 1932
|