Designed to connect broad gage (5 ft 6 in.) system of North Western Railway with its narrow gage (2 ft 6 in.); nine 263-ft modified Petit-type truss spans formed originally designed structure, shorter 164-ft subdivided Pratt truss spans being added as result of experience gained during 1929 floods. Mar n 3 p 73-80: Wells, caissons and piers; working season 1928-31; serious damage by high floods in 1929. Apr n 4 p 124-129: Girder erection.
Indus bridge at Kalabagh, North Western Railway, India
Ry Engr
Railway Engineer ; 55 , n 3-4
1934
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of attock bridge across the river indus on North Western Railway, India
Engineering Index Backfile | 1931
|Reconstruction of attock bridge across the river indus on North Western Railway, India
Engineering Index Backfile | 1931
|Reconstruction of Kotri bridge, North-Western Railway of India
Engineering Index Backfile | 1933
North western railway of India
Engineering Index Backfile | 1932
|Bridge over the indus river at Kotri, northwestern railway
Engineering Index Backfile | 1901