Tilmanstone (Kent) Colliery ropeway, 7 1/4 mi. long, conveying coal direct from mine to ship at Dover Harbor; power supplied by Belliss and Morcom steam engine; operating costs.
Aerial ropeway for transporting coal
Ry. Gaz
Railway Gazette and Railway News ; 54 , n 5
1931
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.