Construction of tunnel connecting Manchester and Sheffield; difficulties encountered in driving and lining tunnel, and novel methods adopted to overcome them. (See also Instn Civ Engrs -- Proc n 5 v 3 pt 1 Mar 19 1954 p 418-420 (discussion) 541-63, 8 supp plates; Engineering v 198 n 614 July 2 1954 p 20-2)
Woodhead new tunnel: Construction of three-mile main double-line railway tunnel
Engineer
Engineer ; 197 , n 5121
1954
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Woodhead new tunnel: Construction of three-mile main double-line railway tunnel
Engineering Index Backfile | 1954
|Woodhead new tunnel: Construction of three-mile main double-line railway tunnel
Engineering Index Backfile | 1954
|Ventilation of woodhead tunnel, great Central railway
Engineering Index Backfile | 1918
|A 30-mile railway tunnel under the cascade mountains
Engineering Index Backfile | 1916
|Driving a five-mile rock tunnel for Japan railway
Engineering Index Backfile | 1922