Construction of tunnel connecting Manchester and Sheffield; difficulties encountered in driving and lining tunnel, and novel methods adopted to overcome them. (See also Instn Civ Engrs -- Proc n 5 v 3 pt 1 Mar 19 1954 p 418-420 (discussion) 541-63, 8 supp plates; Engineer v 197 n 5121 Mar 19 1954 p 418-20)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Woodhead new tunnel: Construction of three-mile main double-line railway tunnel


    Additional title:

    Engineering


    Contributors:

    Published in:

    Engineering ; 198 , n 614


    Publication date :

    1954


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Woodhead new tunnel: Construction of three-mile main double-line railway tunnel

    Scott, P.A. / Campbell, J.I. | Engineering Index Backfile | 1954


    Woodhead new tunnel: Construction of three-mile main double-line railway tunnel

    Scott, P.A. / Campbell, J.I. | Engineering Index Backfile | 1954


    Ventilation of woodhead tunnel, great Central railway

    Ball, James B. | Engineering Index Backfile | 1918


    A 30-mile railway tunnel under the cascade mountains

    Chittenden, H.M. | Engineering Index Backfile | 1916


    Driving a five-mile rock tunnel for Japan railway

    Engineering Index Backfile | 1922