Failure of Winona galvanized-iron flume, 210 ft long, of Canadian Pacific Railway Co, due to leakage which softened supports and undermined bents; reconstruction of flumes including waterproofing with coating of pitch and tallow which stopped all leakage.
Maintenance of Canadian irrigation flume
Civ Eng (NY)
1934
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1961
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2002
|Engineering Index Backfile | 1961
Engineering Index Backfile | 1961
Emerald Group Publishing | 1998