Failure of Winona galvanized-iron flume, 210 ft long, of Canadian Pacific Railway Co, due to leakage which softened supports and undermined bents; reconstruction of flumes including waterproofing with coating of pitch and tallow which stopped all leakage.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Maintenance of Canadian irrigation flume


    Additional title:

    Civ Eng (NY)


    Contributors:

    Published in:

    Publication date :

    1934


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Flume stabilisation system

    Engineering Index Backfile | 1961


    Flume Tests Results

    Li, Ya / Wang, Jun / Wang, Wei et al. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2002

    Free access

    Flume stabilisation system

    Engineering Index Backfile | 1961


    Flume stabilisation system

    Engineering Index Backfile | 1961


    TIP solder flume extractor

    Emerald Group Publishing | 1998