Particulars of two 15,600-ton Diesel tankers, Montrolite and Canadolite, built for Standard Oil Co. of New Jersey and Imperial Oil, Ltd., Toronto, which were delivered in February and April 1926, respectively, and have been in constant service; length 161,467 m.; oil is stored in 12 main tanks and 6 lateral tanks on each side; equipped with two 2-cylinder, single-acting, 2-stroke Krupp Diesel engines.
Tanker construction at the Germania shipyard
Kiel Tankschiffbau auf der Germaniawerft, Kiel
Werft-Reederei-Hafen ; 9 , n 18
1928
4 pages
7 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Yacht construction at the Krupp Germania shipyard
Engineering Index Backfile | 1924
|Motor-yacht construction at the Germania shipyard, Kiel
Engineering Index Backfile | 1926
|Construction of diesel tanker at Germania shipyards
Engineering Index Backfile | 1931
|Drydock of Krupp Germania shipyard
Engineering Index Backfile | 1925
The drydock of the fried. Krupp Germania shipyard, Kiel
Engineering Index Backfile | 1925