Particulars of two 15,600-ton Diesel tankers, Montrolite and Canadolite, built for Standard Oil Co. of New Jersey and Imperial Oil, Ltd., Toronto, which were delivered in February and April 1926, respectively, and have been in constant service; length 161,467 m.; oil is stored in 12 main tanks and 6 lateral tanks on each side; equipped with two 2-cylinder, single-acting, 2-stroke Krupp Diesel engines.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Tanker construction at the Germania shipyard


    Additional title:

    Kiel Tankschiffbau auf der Germaniawerft, Kiel


    Contributors:
    Cords, E. (author)

    Published in:

    Publication date :

    1928


    Size :

    4 pages


    Remarks:

    7 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    German




    Yacht construction at the Krupp Germania shipyard

    Ko¨ / ppe | Engineering Index Backfile | 1924


    Motor-yacht construction at the Germania shipyard, Kiel

    Cords, E. | Engineering Index Backfile | 1926


    Construction of diesel tanker at Germania shipyards

    Koeppe | Engineering Index Backfile | 1931


    Drydock of Krupp Germania shipyard

    Engineering Index Backfile | 1925