Southern Railway had pressed-steel ties in use on London-Portsmouth main line for 7 1/2 years and they are in perfect condition still and give less trouble in maintenance than timber; satisfactory results is seen in announcement of order for 70,000 steel ties by Southern Railway.
Steel sleepers on the southern railway
Ry. Gaz
Railway Gazette and Railway News ; 49 , n 23
1928
2 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Use of concrete sleepers and steel sleepers on Southern Railway
Engineering Index Backfile | 1943
|Engineering Index Backfile | 1963
Ductile iron railway sleepers and their properties compared to steel sleepers
Tema Archive | 1979
|Engineering Index Backfile | 1945
Engineering Index Backfile | 1944