Southern Railway had pressed-steel ties in use on London-Portsmouth main line for 7 1/2 years and they are in perfect condition still and give less trouble in maintenance than timber; satisfactory results is seen in announcement of order for 70,000 steel ties by Southern Railway.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Steel sleepers on the southern railway


    Weitere Titelangaben:

    Ry. Gaz


    Erschienen in:

    Erscheinungsdatum :

    1928


    Format / Umfang :

    2 pages


    Anmerkungen:

    1 Fig.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Use of concrete sleepers and steel sleepers on Southern Railway

    Ellson, G. | Engineering Index Backfile | 1943


    Railway sleepers

    Engineering Index Backfile | 1963


    Ductile iron railway sleepers and their properties compared to steel sleepers

    Rao, P.S. / Sengupta, S.K. / Mohanty, P.K. | Tema Archiv | 1979


    Concrete railway sleepers

    Engineering Index Backfile | 1945


    Concrete railway sleepers

    Engineering Index Backfile | 1944