How continuous communication with moving trains on Belgian National Railways is achieved by track conductors over which control signals are transmitted by digital computer; system installed consists of loop of insulated cable 15 km long laid between rails and fed at one end with signals from trackside control building; equipment installed experimentally is suitable for continuous train control, repetition of standard signal aspects in driver's cab, and telephone link. (38370)
SNCB trials with inductive train communication
Ry Gaz
Railway Gazette ; 125 , n 9
1969
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
IuD Bahn | 1997
|Train conductor recruitment and training at SNCB
British Library Online Contents | 2001
|ARTICLES - Train conductor recruitment and training at SNCB
Online Contents | 2001
|A Configurable Train Driving Simulator for the SNCB
British Library Conference Proceedings | 1995
|SNCB and NS abandon V 250 "Fyra" train
IuD Bahn | 2013