Construction of tunnel and terminal for Canadian railway at Montreal; tunnel is 16,315 ft. long and its construction required the excavation of 422,358 cu. yd. of rock.
The Mount Royal tunnel
Jl. Eng. Inst. Canada
1919
32 pages
40 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1917
|Electrification of Mount Royal tunnel
Engineering Index Backfile | 1914
Completing the Mount Royal tunnel into Montreal
Engineering Index Backfile | 1916
The Mount Royal tunnel of the Canadian Northern railway
Engineering Index Backfile | 1913