Methods used in track maintenance service for Los Angeles Junction Railway include welding 128-lb crossing rails together and attaching them to 90-lb siding rails on each side of crossing; compromise joints enable two dissimilar rails to be bolted together; rail connecting welding technique described.
Rail welding and reconditioning
Welding Engr
Welding Engineer ; 36 , n 12
1951
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1935
|Engineering Index Backfile | 1934
|Reconditioning of Plant by Welding
Emerald Group Publishing | 1941
|RECONDITIONING - Reconditioning news
Online Contents | 2002
RECONDITIONING - Reconditioning News
Online Contents | 2003