Completion of road will give Toronto, north-south artery, relieving traffic congestion; various bridge structures illustrated and described were designed for maximum use of Canadian steel and other materials and maximum economy of construction; project carried out by Toronto Dept of Works; total length 6860 ft, right of way 70 ft wide, providing for 54-ft roadway and two 8-ft sidewalks.
Structures on clifton road extension in Toronto
Roads Bridges
Roads and Bridges ; 87 , n 1
1949
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1957
|Clifton forge (va) Terminal Involves Heavy Work
Engineering Index Backfile | 1924
Clifton forge (va)Terminal Involves Heavy Work
Engineering Index Backfile | 1924
A brief history of the Clifton-Morenci district
Engineering Index Backfile | 1929
|A brief history of the Clifton-Morenci district
Engineering Index Backfile | 1929
|