Completion of road will give Toronto, north-south artery, relieving traffic congestion; various bridge structures illustrated and described were designed for maximum use of Canadian steel and other materials and maximum economy of construction; project carried out by Toronto Dept of Works; total length 6860 ft, right of way 70 ft wide, providing for 54-ft roadway and two 8-ft sidewalks.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Structures on clifton road extension in Toronto


    Weitere Titelangaben:

    Roads Bridges


    Beteiligte:
    Guscott, S.L. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1949


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Metro Toronto road projects

    LeBourdais, E. | Engineering Index Backfile | 1957


    Clifton forge (va)Terminal Involves Heavy Work

    Engineering Index Backfile | 1924


    Clifton forge (va) Terminal Involves Heavy Work

    Engineering Index Backfile | 1924


    A brief history of the Clifton-Morenci district

    Robison, G.M. | Engineering Index Backfile | 1929


    A brief history of the Clifton-Morenci district

    Robison, G.M. | Engineering Index Backfile | 1929