Project constructed by Louisiana Department of Highways will carry vehicular traffic under Intracoastal Waterway; two traffic lanes each 11 ft wide, and one pedestrian walkway 5 ft wide, provided; tunnel consists of single tube of reinforced concrete 800 ft long and two approach ramps each 567 ft long; 200 ft center length covered by 1/4 in. thick steel armor plate; cofferdam and ramp construction; lighting and ventilation.
Louisiana's first tunnel built in open Cofferdam
Civ Eng (NY)
Civil Engineering (New York) ; 25 , n 7
1955
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Louisiana's Experience with Open-Graded Friction Course Mixtures
Transportation Research Record | 2012
|Louisiana's Experience with Open-Graded Friction Course Mixtures
Online Contents | 2012
|Review of Louisiana's Pavement Management System
Transportation Research Record | 2008
|