Project constructed by Louisiana Department of Highways will carry vehicular traffic under Intracoastal Waterway; two traffic lanes each 11 ft wide, and one pedestrian walkway 5 ft wide, provided; tunnel consists of single tube of reinforced concrete 800 ft long and two approach ramps each 567 ft long; 200 ft center length covered by 1/4 in. thick steel armor plate; cofferdam and ramp construction; lighting and ventilation.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Louisiana's first tunnel built in open Cofferdam


    Weitere Titelangaben:

    Civ Eng (NY)


    Beteiligte:
    Rau, I.B. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1955


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Louisiana's Experience with Open-Graded Friction Course Mixtures

    Kabir, M. Sharear / King, William / Abadie, Christopher et al. | Transportation Research Record | 2012



    Review of Louisiana's Pavement Management System

    Khattak, Mohammad Jamal / Baladi, Gilbert Y. / Zhang, Zhongjie et al. | Transportation Research Record | 2008


    SUCTION PILE COFFERDAM

    DINGMAN SCOTT P / LOUGHRIDGE PERRY | Europäisches Patentamt | 2022

    Freier Zugriff

    COFFERDAM HEATING APPARATUS

    CHOI KWANG HO | Europäisches Patentamt | 2016

    Freier Zugriff