Operation of electrified London Midland Region's main line between Euston, Manchester, Liverpool and Birmingham on 25 kv overhead wire system; feature of rebuilt Euston station is that all vehicle movement in station precints takes place underground, and passengers have unrestricted and unimpeded use of ground level area, where all facilities are grouped; access to 15 passenger platforms is by ramps from concourse. (06097)
London Midland electrification is showing results
Ry Gaz
Railway Gazette ; 124 , n 21
1968
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Midland railway electrification
Engineering Index Backfile | 1908
Midland railway electrification
Engineering Index Backfile | 1908
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1955
|IuD Bahn | 2009
|