Operation of electrified London Midland Region's main line between Euston, Manchester, Liverpool and Birmingham on 25 kv overhead wire system; feature of rebuilt Euston station is that all vehicle movement in station precints takes place underground, and passengers have unrestricted and unimpeded use of ground level area, where all facilities are grouped; access to 15 passenger platforms is by ramps from concourse. (06097)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    London Midland electrification is showing results


    Weitere Titelangaben:

    Ry Gaz


    Beteiligte:

    Erschienen in:

    Railway Gazette ; 124 , n 21


    Erscheinungsdatum :

    1968


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Midland railway electrification

    Engineering Index Backfile | 1908


    Midland railway electrification

    Engineering Index Backfile | 1908




    Turning round London Midland

    Mile, Tony / Hodson, Mike | IuD Bahn | 2009