As an archipelagic country, Indonesia has high needs for its aviation development. About 270 million people are predicted to fly from and within Indonesia in 2034, which is three times larger than current market conditions. Due to the complexity of aircraft development projects, management of a well-designed Indonesian aircraft design project needs to be implemented. This research aims to analyze the scheduling of aircraft wing structure design project made in Indonesia. Critical Path Method (CPM) and Resource-Constrained Project Scheduling (RCPS) are used to get better scheduling with a shorter duration to complete the project. Results from resource allocation using RCPS can yield a shorter project duration (730 working days) compared to the company’s normal resource allocation (950 working days).
Scheduling for Indonesia’s Aircraft Wing Structure Design Project with Critical Path Method and Resource-Constrained Project Scheduling
2018
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
DOAJ | 2018
|Resource-Constrained Project Scheduling and Timetabling
British Library Conference Proceedings | 2000
|Resource constrained project scheduling by harmony search algorithm
Online Contents | 2017
|Resource constrained project scheduling by harmony search algorithm
Springer Verlag | 2017
|Chaotic differential evolution algorithm for resource constrained project scheduling problem
British Library Online Contents | 2014
|