As an archipelagic country, Indonesia has high needs for its aviation development. About 270 million people are predicted to fly from and within Indonesia in 2034, which is three times larger than current market conditions. Due to the complexity of aircraft development projects, management of a well-designed Indonesian aircraft design project needs to be implemented. This research aims to analyze the scheduling of aircraft wing structure design project made in Indonesia. Critical Path Method (CPM) and Resource-Constrained Project Scheduling (RCPS) are used to get better scheduling with a shorter duration to complete the project. Results from resource allocation using RCPS can yield a shorter project duration (730 working days) compared to the company’s normal resource allocation (950 working days).
Scheduling for Indonesia’s Aircraft Wing Structure Design Project with Critical Path Method and Resource-Constrained Project Scheduling
2018
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
| DOAJ | 2018
Resource-Constrained Project Scheduling and Timetabling
| British Library Conference Proceedings | 2000
Resource constrained project scheduling by harmony search algorithm
| Online Contents | 2017
Resource constrained project scheduling by harmony search algorithm
| Springer Verlag | 2017
Chaotic differential evolution algorithm for resource constrained project scheduling problem
| British Library Online Contents | 2014