Logistic transport passing through road transport in Palembang city has been very high. To support green Transport, it is recommended to convert some of land logistic transports to river transport. However, the river transport has not been ready in terms of dredging and maintaining water level of Musi River. Furthermore, Boombaru Port, which has been shallow, and has high tidal level difference, can cause the process of loading and unloading become longer. High dwelling time is one of many problems that happen in port’s container terminal in Indonesia. This is commonly caused by longer loading and unloading time than those ports with high navigability and good handling equipment. Loading and unloading time depends on some factors, i.e ship size, limitation of equipment and stacking yard, a shallow port basin, tidal period and tidal magnitude. This paper aims to model the loading and unloading Time at Container Terminal of Boombaru Port, and analyze the effect of some factors on loading and unloading time. The model derived is Y = 0.501 X1 – 0.021 X2 – 2.63 X3 – 29.745, which X1 is Length Over All (m), X2 is Low Tide Elevation (cm) and X3 is duration of tidal period (hour).


    Access

    Download


    Export, share and cite



    Title :

    Analysis of Model Loading and Unloading Time of Ships at Boom Baru Port, Palembang, Indonesia


    Contributors:


    Publication date :

    2017




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown






    METHOD FOR CONTROLLING PORT LOADING AND UNLOADING APPARATUS AND PORT LOADING AND UNLOADING APPARATUS

    OGAWA SATORU / KASAI HIROSHI / MENO SHO | European Patent Office | 2016

    Free access

    Method for controlling port loading and unloading apparatus and port loading and unloading apparatus

    OGAWA SATORU / KASAI HIROSHI / MENO SHO | European Patent Office | 2017

    Free access